Click on the map to bring up a detailed Acrobat PDF version

The current proposal presented to the town is for 44 units housed in 22 buildings separated in 3 different clusters. All of these units use the same leach fields labeled at the bottom of the map.

There are 2 road access points. The road from the Bayberry access on the right of the map is paved to the leach fields. The road from the Ashley access is on the left of the map and is gravel to the leach fields.

The project proposes widening Bayberry from the access point to Heald St at the bottom of the map. There is no proposal to upgrade Heald St.

The upper left quarter of the map is an overall layout of the project.

-- back --